U.S. awards Lower St. Anthony Falls Dam machinery, control, lighting rehab

Lower St. Anthony Falls Dam

The U.S. Army Corps of Engineers awarded a contract to BBA Construction LLC to replace central control station electrical equipment at its Lower St. Anthony Falls Lock and Dam in Minneapolis.

The Corps' St. Paul District took bids for the work in June.

Under a $415,571 contract, BBA, of Bloomington, Ill., is to remove and replace motor controls, including feeder breakers, motor starters, lighting panels, and relay chasses in the main office: replace dam gate and lock tainter gate limit switches and wiring; furnish and install temporary breaker panels and wiring for temporary power; and provide debug, startup and function test demonstration of installed equipment.

Constructed in 1956 for navigation on the Mississippi River, Lower St. Anthony Falls Lock and Dam includes a concrete spillway with four tainter gates. Though having no hydropower, the Corps dam is the location of the 8.98-MW Lower St. Anthony Falls hydroelectric project (No. 12451) licensed by the Federal Energy Regulatory Comission. That project was placed in service in 2011 after delays caused by the collapse of a highway bridge in 2007.

HydroVision International 2014 Keynote Speakers

Presenting the HydroVision International 2014 Keynote Speakers

Check out a slideshow covering the keynote speakers at the HydroVision International 2014 conference and exhibition

Click Here >>

Hydro Industry Financials

Buyers Guide Products

Modernization and renewal

TOSHIBA contributes to numerous modernizations ...

TES VSETIN Service Activities

Installation and initiation Operator training W...

Generators and Motor Repair

Service Activities: Installation and initiation...

Hydropower Generation Services OnSite

We evaluate each situation and provide turnkey ...

Maintenance & Construction Services

NAES is a leading provider of construction, ins...

Analysis, Repair & Upgrade Spring-bed Hydroelectric Bearings

Pioneer offer you the less expensive option to ...

Most Read Articles

Recent Comments

Buyers Guide Companies

SBIW Inc

Rehabilitation of turbine, generator and auxili...

Shenyang Getai Hydropower Equipment Co Ltd

Manufacturer of steel runner for water turbine,...

Alstom

Alstom provides products and services for turnk...

Ayres Associates

Provides inspection and FERC compliance, rehabi...

HydroWorks Ltd

Designs and manufactures Pelton, Francis and Ka...

Continuing Education

Professional Development Hours
To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

07/01/2014
Volume 33, Issue 6
file
07/01/2014
Volume 22, Issue 4
file

Archived Articles

2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
Hydro Review Past Issues