Untitled Document

BHEL commissions fifth turbine unit at India's 412-MW Rampur hydroelectric plant

Himachal Pradesh map

Equipment manufacturer Bharat Heavy Electricals Ltd. (BHEL) has commissioned the fifth of six 68 MW turbine units at the 412-MW Rampur hydroelectric plant in Himachal Pradesh.

HydroWorld.com reported BHEL completed installation of the fourth unit in June, at which point the company said the remaining pair were in an "advanced stage" of installation.

Each of Rampur's units are Francis-type turbines, operating at a head of 119 meters with matching synchronous generators of 200 rpm. BHEL was also responsible for supplying static excitation systems, main inlet valves, digital governors, a control and monitoring (SCADA) system, station auxiliaries, gas-insulated switchgear, and balance-of-plant services.

The plant is located on the Satluj River and operated by state-owned developer SJVN Ltd.

For more news from Asia, visit here.
 

Related Articles

Supreme Court ruling allows work to resume on Panama's 29-MW Barro Blanco hydropower project

Panama's Supreme Court overruled a temporary suspension of hydroelectric projects in the cou...

Canadian Spotlight

The latest hydropower industry news from Canada

Financing Long-term Hydropower Requires Mitigating Risks Prior to ROI

Financing Long-term Hydropower Requires Mitigating Risks Prior To ROI The long-term, relativ...

Quantifying Development Potential in the Pacific Northwest

According to a recently completed scoping study, the Pacific Northwest of the U.S. holds sig...

Recent Comments




Hydro Slideshows

more slideshows >>  

Hydro Whitepapers

Industry News

Editor's Picks

07/01/2015
Volume 34, Issue 6
07/01/2015
Volume 23, Issue 4

Buyers Guide Products

Buyers Guide Companies