• Connect With Us:
  • LIHI awards low-impact certification to 8-MW Milford hydropower plant

    Milford Hydropower Plant

    The Low Impact Hydropower Institute's governing board awarded low-impact certification status to the 8-MW Milford hydropower project.

    The Black Bear Hydro-owned plant, located on the main stem of the Penobscot River in Maine, will now carry the LIHI certification until November 13, 2018.

    Per LIHI's unanimous certification, Milford's operators will have to comply with several obligations, including:

    • Conducting fish passage effectiveness studies, including numerical performance on specific standards for Atlantic salmon, for the next three years to confirm the adequacy of fishways installed
    • Protecting three state-threatened mussel species located in the vicinity of Milford that could be impacted during significant impoundment lowering.
    • Reporting to LIHI on the status and results of consultations regarding a canoe portage trail, as well as the development of the trail.

    LIHI is a non-profit organization dedicated to reducing the environmental impacts of hydropower generation through the certification of hydropower projects that have avoided or reduced their environmental impacts pursuant to the institute’s criteria.

    The voluntary LIHI program is designed to help consumers identify environmentally sound, low-impact hydropower facilities. Certification under the program means the owner can market the project as a certified low-impact facility.

    For more small hydropower news, visit here.



    Hydro Industry Financials

    Buyers Guide Products

    CARDOX Carbon Dioxide Systems

    Chemetron has been designing and providing CARD...

    Most Read Articles

    Recent Comments

    Buyers Guide Companies

    Nova Analytical Systems Inc

    Portable and continuous gas analyzers and gas m...

    Continuing Education

    Professional Development Hours
    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

    03/01/2014
    Volume 33, Issue 2
    file
    01/01/2014
    Volume 22, Issue 1
    1401hrw-cvr

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Premium Content AD Promo Space