• Connect With Us:
  • Reclamation addresses dam safety at 2,078-MW Hoover

    Hoover Dam

    Deficiencies identified in a recent U.S. Department of Labor Occupational Safety and Health Administration inspection of Hoover Dam are causing the Department of Reclamation to take "aggressive steps" in addressing them, HydroWorld.com has learned.

    Deficiencies identified in a recent U.S. Department of Labor Occupational Safety and Health Administration inspection of Hoover Dam are causing the Department of Reclamation to take "aggressive steps" in addressing them, HydroWorld.com has learned.

    However, items identified by OSHA at the 2,078-MW hydropower project do not jeopardize the safety of the general public or threaten the structural integrity of the dam or dam operations, Reclamation said.

    Amongst OSHA's findings were a drill press not mounted to a bench, equipment without necessary guards and a lack of proper labels on electrical panels -- all of which have been corrected, Reclamation said. Another issue regards the dam's doors, which were originally constructed built to open inward instead of outward as is now required.

    "Although one violation is one too many, we are taking the necessary steps to ensure the issues raised are fixed and do not happen again," Reclamation Lower Colorado Regional Director Terry Fulp said.

    Reclamation said that it will share the findings of this OSHA inspection with its other offices to ensure similar problems and violations don't also exist at other facilities.

    "A comprehensive and well-supported occupational safety and health program is important to a strong and productive workforce," said Reclamation Commissioner Michael L. Connor. "Reclamation will do what is necessary to ensure that safety continues to come first at its offices and facilities."

    HydroWorld.com reported in October that President Barack Obama had taken a break from his campaign preparations to view the historic structure.

    Hydro Industry Financials

    Buyers Guide Products

    Digital Governor Conversions and Retrofit Kits

    Want to Go Digital? Over the last 10 years we h...

    Standard & Expedited Bearing Repair Services

    Our service and repair department is the longes...

    Canyon Hydro Pelton Turbines

    Canyon Hydro is a leading designer and manufact...

    Manitou Falls 1999

    1'st PTFE-lined thrust bearing shoes delivered ...

    Most Read Articles

    Recent Comments

    Buyers Guide Companies

    Sauer Compressors USA Inc

    ABB Inc/High Current Systems

    Barr Engineering Co

    JM Power Aggregates Ltd

    Owner, inventor and distributor of an environme...

    Hydro Power Services LLC

    Provides service contractor specializing in fie...

    Continuing Education

    Professional Development Hours
    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

    12/01/2013
    Volume 32, Issue 10
    file
    11/01/2013
    Volume 21, Issue 6
    1311hrw-cvr

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Premium Content AD Promo Space