Untitled Document

Brazil's 19-MW Cavernoso 2 small hydropower project operating at full capacity

Parana State

Brazil's 19-MW Cavernoso 2 hydropower project is now running at full capacity following the startup of the plant's last two hydro turbines, operator Compahia Paranaense de Energia (Copel) announced.

The small hydro project has been operating with one 6.3 MW turbine since the Agencia Nacional de Energia Electrica (ANEEL) gave its go-ahead for commercial operation in April.

The plant is located in Brazil's southern Parana state and will feed power to around 50,000 consumers in Virmond and Candoi, Copel said.

Cavernoso 2 was announced in March 2011 as part of the Brazilian government's special infrastructure development program known as Reidi.

For more small hydropower news, visit here.

Latest Slideshow

Your Picture Here: Send Us Your Dam Selfie

View Slideshow >>

more slideshows >>   

Hydro Whitepapers

Hydro Industry Financials

Most Read Articles

Recent Comments

Continuing Education

Professional Development Hours
To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

03/01/2015
Volume 34, Issue 2
1503HRcover
03/01/2015
Volume 23, Issue 2
1503HRWcover

Archived Articles

2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
Hydro Review Past Issues