Untitled Document

Brazil's 19-MW Cavernoso 2 small hydropower project operating at full capacity

Parana State

Brazil's 19-MW Cavernoso 2 hydropower project is now running at full capacity following the startup of the plant's last two hydro turbines, operator Compahia Paranaense de Energia (Copel) announced.

The small hydro project has been operating with one 6.3 MW turbine since the Agencia Nacional de Energia Electrica (ANEEL) gave its go-ahead for commercial operation in April.

The plant is located in Brazil's southern Parana state and will feed power to around 50,000 consumers in Virmond and Candoi, Copel said.

Cavernoso 2 was announced in March 2011 as part of the Brazilian government's special infrastructure development program known as Reidi.

For more small hydropower news, visit here.

Related Articles

IHA new hydropower report

International Hydropower Association releases 2015 Hydropower Status Report

The International Hydropower Association announces availability of its 2015 Hydropower Statu...

China Three Gorges buys majority shares in two Brazilian hydropower projects

Brazilian infrastructure group Triunfo Participacoes e Investimentos S,A. .has agreed to sel...

Proposal could ease financial burden imposed on hydropower project operators during Brazil's drought

A provisional decree approved by Brazil's legislature yesterday would allow hydroelectr...

Brazil's Colider, Baixo Iguacu hydropower projects receive Copel financing

An earnings statement from Copel shows the Brazilian utility intends to spend about US$100 m...

Recent Comments

Hydro Slideshows

more slideshows >>  

Hydro Whitepapers

Industry News

Editor's Picks

Volume 34, Issue 6
Volume 23, Issue 4

Buyers Guide Products