• Connect With Us:
  • Sacyr expands to Peru with two new small hydropower projects

    Sacyr Logo

    Infrastructure developer Sacyr has obtained a US$77.9 million contract from Generacion Andina to construct a pair of hydroelectric plants in Peru via its subsidiary, Sacyr Construccion.

    The hydropower projects represent the Spanish company's first foray into Peru, where it will build the 8 de Agosto and El Carmen plants under an engineering, procurement and construction arrangement.

    The 8 de Agosto will be located in Huanuco and will have an installed capacity of 19.83 MW. Sacyr said it is responsible for constructing a 3,243-meter-long conduction system, an 897.6-meter-long section of tunnel, and a diversion dam with mobile barrage and drain gate.

    Meanwhile, the El Carmen will have an installed capacity of 8.6 MW.

    HydroWorld.com reported in May that the Peruvian government was seeking consultants to study the country's small hydropower potential.

    For more small hydro news, visit here.

    Hydro Industry Financials

    Most Read Articles

    Recent Comments

    Buyers Guide Companies

    Synergy Holdings Inc

    Renewable energy for residential, commercial, m...

    WorleyParsons – Brasil

    Zollern Transmissões Mecânicas Ltda

    Manufacturers of plain bearings, hydro power be...

    Potencia Industrial SA

    Manufactures hydroelectricelectric generators r...

    Rubberart Artefatos de Borracha Ltda

    Specializes in rubber seals for power generatio...

    Continuing Education

    Professional Development Hours
    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

    12/01/2013
    Volume 32, Issue 10
    file
    01/01/2014
    Volume 22, Issue 1
    1401hrw-cvr

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Premium Content AD Promo Space