• Connect With Us:
  • Voith commissions pair of turbine units at Ecuador's 42-MW Baba

    Ecuador Map

    Two Voith Hydro-produced Kaplan turbine units are now in commercial operation at Ecuador's 42-MW Baba hydropower plant.

    The Baba facility, operated by utility company Hidroenergetico del Litoral (Hidrolitoral), is part of the Baba Multipurpose Project that also includes the already existing 213-MW Central Marcel de Wind.

    Voith said the project is not only intended to help with energy production, but also in regulating the Baba River and improving conditions for agriculture and tourism.

    The company said the turbines were the first Kaplan units ever to be installed in Ecuador. In addition to the turbines, Voith also supplied the generator and electrical and mechanical services.

    HydroWorld.com reported earlier this month that Voith, along with Alstom, is manufacturing what will become Latin America's largest rotor.

    Hydro Industry Financials

    Most Read Articles

    Recent Comments

    Buyers Guide Companies

    Synergy Holdings Inc

    Renewable energy for residential, commercial, m...

    WorleyParsons – Brasil

    Zollern Transmissões Mecânicas Ltda

    Manufacturers of plain bearings, hydro power be...

    Potencia Industrial SA

    Manufactures hydroelectricelectric generators r...

    Rubberart Artefatos de Borracha Ltda

    Specializes in rubber seals for power generatio...

    Continuing Education

    Professional Development Hours
    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

    12/01/2013
    Volume 32, Issue 10
    file
    01/01/2014
    Volume 22, Issue 1
    1401hrw-cvr

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Premium Content AD Promo Space