Untitled Document

Nigeria working with two Chinese companies to build 700-MW plant on Northern Zungeru River

Nigeria has signed an agreement with Sinohydro-CNEEC Corporation, composed of Sinohydro Corporation and China National Electrical Equipment Corporation, to build the 700-MW Zungeru hydroelectric plant on the Northern Zingeru River.

Nigeria’s Minister of State for Power Hajiya Zainab Kuchi and Vice President of Sinohydro-CNEED Corporation Du Nan signed the agreement, which is an extension of the memorandum of understanding signed between Nigeria and Sinohydro to build a 3,050-MW hydropower facility on eastern Mambila Plateau.

The project is expected to cost NGN163 billion (US$1 billion). The Export-Import Bank of China will bear most of the cost of the Zungeru hydroelectric facility, providing 75% of funds while Nigeria provides the remaining 25%.

Local contract components of the project will be handled by Nigerian companies.

The feasibility studies for this project were initially completed in 1982. In 1992, contracts were awarded for the engineering design, preparation of tender documents, evaluation report, construction management and project supervision. Finally, the feasibility studies and engineering design were reviewed by Coyne et Bellier in 2008, with a recommendation of installed capacity of 700 MW, compared with the previous capacity of 950 MW.

The project is expected to be completed in about 48 months, sources indicate.

In other news, Power Holding Co. of Nigeria plans to hire consulting firms to develop an inventory of potential hydropower project sites in the catchment areas of the Niger and Benue rivers.

Related Articles

Laos hydropower development

Laos seeks consultants to advance independent hydropower project development

The government of Laos invites expressions of interest from consultants to help develop an i...
Upper Lillooet hydro

Firefighters set up at temporarily out-of-service Upper Lillooet Hydro Project

BC Wildfire Service personnel have been using the project construction camp for the Upper Li...

Recent Comments




Hydro Slideshows

more slideshows >>  

Hydro Whitepapers

Industry News

Editor's Picks

06/01/2015
Volume 34, Issue 5
07/01/2015
Volume 23, Issue 4

Buyers Guide Products

Buyers Guide Companies