Untitled Document

Contract awarded for work on Ruzizi hydropower projects

The European Union has awarded a contract worth US$1.44 million to Studio Ing. G. Pietrangeli srl. of Italy to perform studies of a grid system and rehabilitation studies for several hydropower projects in East Africa.

The European Union (EU) last solicited bids for the work in December 2011, which includes a grid system study for the proposed 145-MW Ruzizi 3 hydroelectric complex and rehabilitation studies for the 29.8-MW Ruzizi 1 and 43.8-MW Ruzizi 2 projects.

Ruzizi 1 is operated by the Democratic Republic of Congo's (DRC) Societe Nationale d'Electricite (SNEL), while Ruzizi 2 and 3 are operated by DRC, Rwanda, and Burundi's SINELAC.

Related Articles

U.S. seeks firms for civil works design of dams, water facilities

The U.S. Army Corps of Engineers seeks information on firms able to perform civil works desi...

U.S. plans call for generator excitation at 494-MW Big Bend hydro project

The U.S. Army Corps of Engineers plans to seek bids to replace generator excitation systems ...

Czech utility awards contract for turbine overhaul at Lipno hydropower plant

Czech utility CEZ has awarded a US$3.4 million contract to CKD Blansko Engineering Inc. to p...

U.S. extends call for HVAC upgrades at 402-MW Dworshak hydro project

The U.S. Army Corps of Engineers has extended the deadline for bids to upgrade the heating-v...

Recent Comments




Hydro Slideshows

more slideshows >>  

Hydro Whitepapers

Industry News

Editor's Picks

06/01/2015
Volume 34, Issue 5
05/01/2015
Volume 23, Issue 3

Buyers Guide Products