• Connect With Us:
  • Kirejczyk Joins HDR Hydropower Services Group

    05/11/2012

    PORTLAND, Maine 5/11/12 (PennWell) -- Juliusz Kirejczyk has joined HDR as a senior consultant in the hydropower services group. Before joining HDR he was a turbine specialist with Toshiba International Corp.

    Kirejczyk has more than 37 years of experience in the hydropower industry, working for manufacturers of hydraulic turbines and pump turbines. He has conducted numerous feasibility and design studies, turbine performance assessments, and performance and design testing. He has led development of environmentally friendly turbine and pump turbine designs, and been active in new technology for variable speed pump turbines. 

    HDR provides services ranging from feasibility studies to project engineering and modernizing existing hydro facilities. In the past 10 years, HDR has led or provided technical support for hydropower licensings/relicensings for more than 100 facilities in 20 states. HDR also works heavily in pumped storage.

    HDR is a global, employee-owned firm providing architecture, engineering, consulting, construction and related services through our various operating companies with more than 7,800 employees. 

    HydroWorld,.com previously reported that HDR was awarded a contract for work along the Savannah River in February.

    Font Sizes:

    Hydro Industry Financials

    Hydro Financial Markets

    01/01/2013
    Volume 32, Issue 1
    file
    Volume 21, Issue 01
    1301-HRW-cvr

    Most Read Articles

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Continuing Education

    Professional Development Hours

    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.