• Connect With Us:
  • Voith Hydro wins contract for work at Hoover Dam

    BOULDER CITY, Nev. 1/18/12 (PennWell) -- Voith Hydro has been awarded a $3.3 million contract to provide parts and labor for Unit A8 at the 2,078-MW Hoover Dam by the Bureau of Reclamation.

    The contract, which was last offered in September 2011, calls for the design, manufacture and delivery of one vertical Francis wide-head-range turbine runner. Voith Hydro is also to deliver a set of wicket gates and a replacement.

    The work is part of Reclamation's effort to more efficiently generate power over a wider range of lake levels than the existing turbines.

    Font Sizes:

    Hydro Industry Financials

    Hydro Financial Markets

    05/01/2013
    Volume 32, Issue 4
    file
    Volume 21, Issue 01
    1301-HRW-cvr

    Most Read Articles

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Continuing Education

    Professional Development Hours

    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.