• Connect With Us:
  • Mavel wins contract for Czech Libechov project

    12/22/2011

    PRAGUE, Czech Republic 12/22/11 (PennWell) -- Mavel has been awarded a US$6.98 million contract by developer Mercator Energy to equip the 4.59-MW Libechov hydroelectric project on the Elbe River in the Czech Republic.

    Mercator first called for bids for the hydropower facility in October 2010, then again in December 2010, June 2011 and most recently, September 2011.

    The contract stipulates that Mavel will manufacture, supply and install one Kaplan turbine-generator with a diameter of 4.8 meters and an average power generation of 12 MWh.

    Libechov is a small town in the Central Bohemian Region of the Czech Republic located about 36 kilometers north of Prague.

    Font Sizes:

    Hydro Industry Financials

    Hydro Financial Markets

    01/01/2013
    Volume 32, Issue 1
    file
    Volume 21, Issue 01
    1301-HRW-cvr

    Most Read Articles

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Continuing Education

    Professional Development Hours

    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.