French utility seeks concrete rehabilitation at Chambon Dam

CHAMBERY, France 11/23/11 (PennWell) -- Electricite de France (EDF) seeks bids for three lots to rehabilitate concrete damaged by alkali-aggregate reaction at Chambon Dam on the Romanche River in eastern France. Bids in separate solicitations are due December 6.

Chambon is a 90-meter-tall, 293-meter-long concrete gravity dam in France's Isere Department, a high-altitude region subject to severe winter weather. EDF is replacing or rehabilitating concrete that has expanded and cracked due to alkali-aggregate reaction. (HRW July 2010)

EDF seeks bids for three separate lots:
o Lot 1, reference No. rfi 53911: reinforcement of the monolith at the top of the dam using pre-stressed anchors, containing the upstream area with carbon-fiber fabric, and patching of the downstream face;
o Lot 2, reference No. rfi 53975: concrete sawing seven vertical slits at the top of the dam from 11 to 16 millimeters, the two highest measuring 42 meters, for a total surface sawed of 2,500 square meters;
o Lot 3, reference No. rfi 53964: removal of upstream waterproofing membrane and installation of a new membrane after construction.

The three lots are expected to require from 27 to 28 months each.

Solicitation documents may be obtained from the address below. Bids are due by 4 p.m. December 6 via EDF's purchasing website, http://portail-achats.edf.com.

For information, contact EDF SA - Direction des Achats, Agence Achats Hydraulique, 13 Rue Jean Girard Madoux, 73026 Chambery, France; Lot 1, Attn.: Dominique Petit, (33) 479-264934, E-mail: dominique.petit@edf.fr; Lot 2, Attn.: Philippe Chretien, (33) 479-264953, E-mail: philippe.chretien@edf.fr; Lot 3, Attn.: Valerie Gambiez, (33) 479-266818, E-mail: valerie.gambiez@edf.fr; Internet: www.edf.fr.

Related Articles

Canada releases energy strategy

Premiers release Canadian Energy Strategy, hydro’s contribution recognized

Canada’s Premiers have released the Canadian Energy Strategy, and hydro is recognized for it...

U.S. seeks spillway gates rehabilitation at 34.5-MW Hills Creek hydro project

The U.S. Army Corps of Engineers seeks bids to rehabilitate three spillway gates at the 34.5...

IHA board members elected

The International Hydropower Association has announced results of its election of IHA board ...

Supreme Court ruling allows work to resume on Panama's 29-MW Barro Blanco hydropower project

Panama's Supreme Court overruled a temporary suspension of hydroelectric projects in the cou...

Recent Comments




Hydro Slideshows

more slideshows >>  

Hydro Whitepapers

Industry News

Editor's Picks

07/01/2015
Volume 34, Issue 6
07/01/2015
Volume 23, Issue 4

Buyers Guide Products