• Connect With Us:
  • U.S. awards bypass relocation contract at 980-MW McNary

    WALLA WALLA, Wash., U.S. 9/20/11 (PennWell) -- The U.S. Army Corps of Engineers has awarded a $10.2 million contract to Advanced American Construction Inc. to relocate a juvenile fish bypass outfall pipe at 980-MW McNary Dam.

    Corps' Walla Walla District took bids Aug. 5 for the work at McNary on the Columbia River in Oregon. The work is proposed to improve survival of bypassed fish returned to the river by relocating the juvenile bypass outfall pipes to a location with improved hydraulic conditions, reducing predation opportunity.

    Advanced American, of Portland, Ore., is to relocate the bypass outfall at McNary from its current location about 250 feet downstream from the dam in front of the powerhouse to a new location about 1,100 feet downstream from the dam and 1,200 feet away from the bank out into the river.

    Hydro Industry Financials

    Buyers Guide Products

    Digital Governor Conversions and Retrofit Kits

    Want to Go Digital? Over the last 10 years we h...

    Standard & Expedited Bearing Repair Services

    Our service and repair department is the longes...

    Canyon Hydro Pelton Turbines

    Canyon Hydro is a leading designer and manufact...

    Manitou Falls 1999

    1'st PTFE-lined thrust bearing shoes delivered ...

    Most Read Articles

    Recent Comments

    Buyers Guide Companies

    Sauer Compressors USA Inc

    ABB Inc/High Current Systems

    Barr Engineering Co

    JM Power Aggregates Ltd

    Owner, inventor and distributor of an environme...

    Hydro Power Services LLC

    Provides service contractor specializing in fie...

    Continuing Education

    Professional Development Hours
    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

    12/01/2013
    Volume 32, Issue 10
    file
    11/01/2013
    Volume 21, Issue 6
    1311hrw-cvr

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Premium Content AD Promo Space