Untitled Document

Tainter gate rehab sought by U.S. for 58-MW Clarence Cannon

The U.S. Army Corps of Engineers seeks bids for repair and repainting of tainter gates and bulkheads at the 58-MW Clarence Cannon hydroelectric project in northeast Missouri. Bids are due Aug. 11.

Authorized by Congress in 1962, Clarence Cannon Dam impounds the Salt River to form Mark Twain Lake, providing hydropower, flood control, recreation, fish and wildlife, water supply, and improved navigation on the Mississippi River.

The Corps seeks bids to sandblast, clean, and paint tainter gates at the main dam and a re-regulation dam and bulkheads at the re-regulation dam. Included is replacement of all seals on the bulkheads.

A solicitation notice may be obtained from the Federal Business Opportunities Internet site, www.fbo.gov, by entering Solicitation No. W912P911R0718 in the "Keyword/Solicitation #" box.

Bids are due Aug. 11. For information, contact Lisa White, Contract Specialist, U.S. Army Corps of Engineers, St. Louis District, Attn: CEMVS-CT, 1222 Spruce St., St. Louis, MO 63103-2833; (1) 314-331-8518; E-mail: lisa.white@usace.army.mil.

For more hydropower tenders, click here.

Latest Slideshow

Your Picture Here: Send Us Your Dam Selfie

View Slideshow >>

more slideshows >>   

Hydro Whitepapers

Hydro Industry Financials

Most Read Articles

Recent Comments

Continuing Education

Professional Development Hours
To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

04/01/2015
Volume 34, Issue 3
new1504HRcover
03/01/2015
Volume 23, Issue 2
1503HRWcover

Archived Articles

2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
Hydro Review Past Issues

Buyers Guide Products

Feasibility Studies

Knight Piesold implements feasibility studies, ...

Underwater Dam Inspection

Hibbard Inshore Inspects: Trash Racks, Lower Ou...

BoatBuster - Public Safety Boat Barriers

Worthington provides complete waterway barrier ...

Geotechnical Engineering, Geologoly and Dam

Design and planning of dams, dykes and structur...

Remedial Water Stop Repair For Monolith Joints in Concrete Gravity Dams

Emagineered Solutions® has expertly serviced co...

Dam Joint Leak Repair

Emagineered Solutions® has expertly serviced co...

Buyers Guide Companies

Toyo Pumps North America Corp

Provides slurry pumping solutions. Provides sub...

McMillen LLC

Offers a “design-procure-build-operate” package...

RST Instruments Ltd

Manufactures quality dam monitoring instrumenta...

Ruhfus Systemhydraulik GmbH

Designs and manufactures hydraulic servomotors ...

Damwatch Engineering Ltd

Damwatch is a NZ-based dam engineering consulta...