Untitled Document

British Columbia dam safety report highlights 2010 dam breach, other incidents

British Columbia has released the first-annual B.C. dam safety report. The publication is one of a dozen recommendations made by the deputy solicitor general after the failure of the Testalinden Dam in June 2010.

There were five dam incidents that required action in British Columbia last year, in addition to the breach of the Testalinden dam in June that sent a wall of mud down on several homes and orchards near Oliver, B.C, the Canadian Press reported.

The Testalinden Dam likely failed because the spillway and the freeboard, the distance between the water's surface and the dam's crest, were inadequate and insufficient, the dam safety report indicates.

The breach has since been stabilized by the dam owner, according to the report.

The five remaining incidents took place at the Goertzen Pond Dam near Osyoyoos, the Grafton Lake Dam on Bowen Island, the Eagle Rock Reservoir south of Chase, the Allan Springs Reservoir in Saanich and the John Hart Dam on the Campbell River.

Dam owners were required to lower water levels, remove a beaver dam, clear a spillway of obstructions, remove vegetation and improve structural problems.

The number of dam owners who complied with reporting requirements increased to 93 percent, up from 87 percent the year before. However, those responses are inconsistent and difficult to interpret, reports indicate.

The report recommends more concise questioning in the future.

There were 99 dam safety audits last year - which falls short of the target of 113 because staff were focused on the Rapid Dam Assessment program put in place after the Testalinden mudslide.

Of B.C's 1,900 dams, about 1,200 are considered low risk.

For more hydropower news and information, click here

Related Articles

Canada releases energy strategy

Premiers release Canadian Energy Strategy, hydro’s contribution recognized

Canada’s Premiers have released the Canadian Energy Strategy, and hydro is recognized for it...

IHA board members elected

The International Hydropower Association has announced results of its election of IHA board ...

Hydro Ottawa acquires 10 run-of-river hydro projects from Fortis

The acquisition of 10 hydroelectric projects by Hydro Ottawa from Fortis, Inc., adds about 3...

Canada utility seeks dam safety reviews for three Nelson River hydro projects

Canadian utility Manitoba Hydro seeks bids to perform three separate dam safety reviews of t...

Recent Comments




Hydro Slideshows

more slideshows >>  

Hydro Whitepapers

Industry News

Editor's Picks

07/01/2015
Volume 34, Issue 6
07/01/2015
Volume 23, Issue 4

Buyers Guide Products