British Columbia dam safety report highlights 2010 dam breach, other incidents

British Columbia has released the first-annual B.C. dam safety report. The publication is one of a dozen recommendations made by the deputy solicitor general after the failure of the Testalinden Dam in June 2010.

There were five dam incidents that required action in British Columbia last year, in addition to the breach of the Testalinden dam in June that sent a wall of mud down on several homes and orchards near Oliver, B.C, the Canadian Press reported.

The Testalinden Dam likely failed because the spillway and the freeboard, the distance between the water's surface and the dam's crest, were inadequate and insufficient, the dam safety report indicates.

The breach has since been stabilized by the dam owner, according to the report.

The five remaining incidents took place at the Goertzen Pond Dam near Osyoyoos, the Grafton Lake Dam on Bowen Island, the Eagle Rock Reservoir south of Chase, the Allan Springs Reservoir in Saanich and the John Hart Dam on the Campbell River.

Dam owners were required to lower water levels, remove a beaver dam, clear a spillway of obstructions, remove vegetation and improve structural problems.

The number of dam owners who complied with reporting requirements increased to 93 percent, up from 87 percent the year before. However, those responses are inconsistent and difficult to interpret, reports indicate.

The report recommends more concise questioning in the future.

There were 99 dam safety audits last year - which falls short of the target of 113 because staff were focused on the Rapid Dam Assessment program put in place after the Testalinden mudslide.

Of B.C's 1,900 dams, about 1,200 are considered low risk.

For more hydropower news and information, click here

HydroVision International 2014 Keynote Speakers

Presenting the HydroVision International 2014 Keynote Speakers

Check out a slideshow covering the keynote speakers at the HydroVision International 2014 conference and exhibition

Click Here >>

Hydro Industry Financials

Most Read Articles

Recent Comments

Buyers Guide Companies

Canadian Babbitt Bearings Ltd

Flowtite Pipe

Brings directly to the US and Canadian markets ...

Canadian Specialty Castings Inc

Canadian Hydro Components Ltd

Designs and manufactures axial flow, Kaplan and...

Continuing Education

Professional Development Hours
To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

07/01/2014
Volume 33, Issue 6
file
07/01/2014
Volume 22, Issue 4
file

Archived Articles

2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
Hydro Review Past Issues