Untitled Document

Cameroon awards construction management contract for Lom Pangar hydro project

Cameroon has awarded a USD 16.2 million contract to France's Coyne et Bellier to manage construction of the 56-MW Lom Pangar hydroelectric project in the Sanaga River Basin.

The Lom Pangar project includes the 46-meter-tall Lom Pangar Dam and a reservoir of 540 square kilometers and storage of 6 billion cubic meters of water. In addition to generating its own electricity, Lom Pangar is expected to control flows to increase generation of downstream hydropower projects.

Under the recently-awarded contract with Cameroon utility Electricity Development Corp., the contract awardee is to perform site studies, study supply and installation of hydroelectric equipment and oversee project construction.

For more hydropower news and information, click here

Latest Slideshow

Your Picture Here: Send Us Your Dam Selfie

View Slideshow >>

more slideshows >>   

Hydro Whitepapers

There is no current content available.

Hydro Industry Financials

Most Read Articles

Recent Comments

Continuing Education

Professional Development Hours
To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

03/01/2015
Volume 34, Issue 2
1503HRcover
03/01/2015
Volume 23, Issue 2
1503HRWcover

Archived Articles

2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
Hydro Review Past Issues

Buyers Guide Products

PTFE-lined Thrust Shoes for VRA Akosombo, Ghana

Designed, manufactured, delivered replacement P...

Buyers Guide Companies

Vesconite

Entec AG Consulting & Engineering

Offers long-standing experience and is highly q...

BG Consulting Engineers Ltd

With subsidiaries in Switzerland, France and Al...

NuPlanet (Pty) Ltd

A small hydro power developer, owner and operat...

NuPlanet

Specializes in comprehensive turnkey maintenanc...