Andritz Hydro wins US40 million Angostura hydropower project contract

Andritz Hydro has won a US$40 million contract for the provision of floodgates and drainage systems for the Angostura hydropower project on the Biobio River in Chile, Chilean utility Colbun announced.

As part of the contract, Andritz Hydro will develop six floodgates over 17 meters in height and two drainage systems. The units will allow the management of water levels, Colbun reported.

Earlier in 2010, Colbun signed a contract worth US$123 million with French firm Alstom for the provision of three turbines for the dam.

The US$420 million, 320-MW Angostura hydro project is expected to come online in early 2013.

For more hydropower news and information, click here

HydroVision International 2014 Keynote Speakers

Presenting the HydroVision International 2014 Keynote Speakers

Check out a slideshow covering the keynote speakers at the HydroVision International 2014 conference and exhibition

Click Here >>

Hydro Industry Financials

Most Read Articles

Recent Comments

Buyers Guide Companies

Synergy Holdings Inc

Renewable energy for residential, commercial, m...

WorleyParsons – Brasil

Zollern Transmissões Mecânicas Ltda

Manufacturers of plain bearings, hydro power be...

Potencia Industrial SA

Manufactures hydroelectricelectric generators r...

Rubberart Artefatos de Borracha Ltda

Specializes in rubber seals for power generatio...

Continuing Education

Professional Development Hours
To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

06/01/2014
Volume 33, Issue 5
file
07/01/2014
Volume 22, Issue 4
file

Archived Articles

2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
Hydro Review Past Issues