Untitled Document

University students to help Aboitiz boost efficiency of hydro projects

The Aboitiz Group plans to work with students from the engineering and architecture division of the Ateneo de Davao University to help boost the efficiency of five hydropower projects operating under Aboitiz subsidiary Hedcor Inc.

Under an agreement, third-year civil engineering students will conduct a site survey, hydro-structure measurements, and draft construction blueprints for the Talomo Hydro 1, 2, 2A, 2B and 3 power plants, regional media reported. The Aboitiz Group has granted P242,000 (US$5,430) for the project, reports indicate.

In other news, construction of a 240-MW hydroelectric power plant is set to begin in the Southern Philippines.

The Agus III hydroelectric project will be constructed along the Agus River complex within Saguiaran in Lanao del Sur and the municipalities of Pantar and Balo-i in Lanao del Norte, wire services reported.

For more hydropower news and information, click here

Related Articles

Salini Impregilo inks US$575 million EPC contract for Georgian 280-MW Nenskra hydroelectric project

Salini Impregilo announced it has signed a US$575 million engineering, procurement and const...

JSW Energy refinances US$1.1 billion in hydroelectric project debt

JSW Energy Ltd., based in Mumbai, India, is refinancing about US$1.1 billion via a 5:25 fina...
Acquiring two Nepal projects

InvestBank acquires majority stake in Tila-1 and Tila-2 hydropower projects in Nepal

InvestBank Corp. has acquired a 70% equity stake in the 440-MW Tila-1 and 420-MW Tila-2 hydr...

HZ Windpower receives approval of its MHK study

Chongqing Haizhuang Windpower Equipment Co. Ltd. (HZ Windpower), based in China, has receive...

Recent Comments

Hydro Slideshows

more slideshows >>  

Hydro Whitepapers

Industry News

Editor's Picks

Volume 34, Issue 6
Volume 23, Issue 4

Buyers Guide Products