• Connect With Us:
  • Andritz Hydro wins contract for replacement turbines at Hoover hydro project

    04/19/2010

    The U.S. Bureau of Reclamation awarded Andritz Hydro a contract for design and supply of a replacement turbine, with an option to supply three more, at the 2,078-MW Hoover Dam hydroelectric project on the Colorado River in Arizona and Nevada.

    The agency began overhaul work on Hoover Dam turbines in 1998.

    BuRec is seeking computational fluid dynamics, design, physical modeling, hydraulic turbine manufacturing and supply of one turbine for Hoover Unit N8, including runner cones, coupling bolts and design of a draft tube throat liner. It proposes an option for manufacture of three more turbines for Units A1, N5 and N6.

    Recently, The Bureau of Reclamation awarded Andritz Hydro an $18.2 million contract to rewind three generators and replace excitation equipment at the 198.72-MW Folsom Dam hydroelectric plant.

    For more hydropower news and information, click here

    Font Sizes:

    Hydro Industry Financials

    Hydro Financial Markets

    01/01/2013
    Volume 32, Issue 1
    file
    Volume 21, Issue 01
    1301-HRW-cvr

    Most Read Articles

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Continuing Education

    Professional Development Hours

    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.