Untitled Document

Peak Hydro awarded contract for ring repairs at Blue Mesa

The Bureau of Reclamation awarded a $458,534 contract to Peak Hydro Services of Chattanooga, Tenn., to repair draft tube discharge rings at the 86.4-MW Blue Mesa hydroelectric plant.

The plant is part of the 1,747-MW Colorado River Storage Project near Montrose, Colo.

Under the contract, Peak Hydro will repair draft tube discharge rings for Blue Mesa’s two Francis turbines. The turbine diameter is 10 feet, while the discharge ring diameter is 8 feet, 1 inch.

The rings have been damaged by cavitation. A previous attempt by the installation of steel plates failed. Peak Hydro must remove remaining plates prior to weld repair and devise the best method to repair the damage.

Latest Slideshow

Your Picture Here: Send Us Your Dam Selfie

View Slideshow >>

more slideshows >>   

Hydro Whitepapers

Hydro Industry Financials

Most Read Articles

Recent Comments

Continuing Education

Professional Development Hours
To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

04/01/2015
Volume 34, Issue 3
new1504HRcover
03/01/2015
Volume 23, Issue 2
1503HRWcover

Archived Articles

2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
Hydro Review Past Issues

Buyers Guide Products

Digital Governor Conversions and Retrofit Kits

Want to Go Digital? Over the last 10 years we h...

Standard & Expedited Bearing Repair Services

Our service and repair department is the longes...

Canyon Hydro Pelton Turbines

Canyon Hydro is a leading designer and manufact...

Manitou Falls 1999

1'st PTFE-lined thrust bearing shoes delivered ...

Buyers Guide Companies

Sauer Compressors USA Inc

Barr Engineering Co

ABB Inc/High Current Systems

JM Power Aggregates Ltd

Owner, inventor and distributor of an environme...

IC-Fluid Power Inc

Founded in 1989 to bring European fluid power t...