• Connect With Us:
  • India's NHPC awards contract to build 330-MW Kishanganga

    01/27/2009
    India hydro developer NHPC Ltd. has awarded a contract to the HCC-Halcrow Consortium for turnkey construction of the 330-MW Kishanganga hydroelectric project on India's Kishanganga River.

    NHPC awarded the 27.26 billion rupee (US$557.75 million) contract to the consortium, comprising Hindustan Construction Co. Ltd. (HCC) of India and Halcrow Group Ltd. U.K.

    HCC, which announced the award to the Bombay Stock Exchange January 23, said it would be responsible for investigations, planning, design and engineering, construction of civil and associated infrastructure, supply, transportation, installation, testing, and commissioning of plant and machinery over 84 months.

    Kishanganga is to be built on the Jhelum River tributary in the Bandipora and Gurez Valley of Jammu &Kashmir State. (HNN 8/21/06) The project includes construction of a 37-meter-tall concrete-faced rockfill dam, a 23.5-kilometer tunnel, and an underground powerhouse with three 110-MW turbine-generators.

    Font Sizes:

    Hydro Industry Financials

    Hydro Financial Markets

    01/01/2013
    Volume 32, Issue 1
    file
    Volume 21, Issue 01
    1301-HRW-cvr

    Most Read Articles

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Continuing Education

    Professional Development Hours

    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.