U.S. scopes experimental operations for 1,312-MW Glen Canyon

The Bureau of Reclamation has completed scoping a proposed long-term experimental plan for operation of 1,312-MW Glen Canyon Dam on the Colorado River near Page.

BuRec said the proposed experimental operations are needed to learn which elements of dam operations and other management actions would lead to recovery and long-term sustainability of downstream resources, while minimizing effects to hydropower capability and flexibility.

The National Environmental Policy Act mandates the scoping process to develop an environmental impact statement on the proposed action. The scoping report summarizes public comments and provides an overview of issues to be analyzed in the EIS.

BuRec received 651 comments during the scoping process. Issues of concern to the public included dam operations, fish and threatened and endangered species, water quality, sediment, experimental design, energy or hydropower, socio-economics, recreation, and cultural resources.

Of the 35 comments made in the energy or hydropower category, 17 said alternatives should focus on protecting or enhancing generation or should limit adverse effects of hydropower production only to the extent needed to achieve recovery and long-term sustainability. Several other comments emphasized the importance of maximizing capacity and flexibility in hydropower operations.

Program to help protect Grand Canyon

BuRec and 16 cooperating agencies will use information from the scoping report to define a range of alternatives for the long-term experimental plan, Regional Director Rick Gold said. (HNN 1/11/07)

The proposed plan could include dam operations, modifications to intake structures, and other management actions such as removal of non-native fish species in the Colorado River below Glen Canyon Dam.

The plan would build on a decade of scientific experimentation and monitoring that has taken place as part of the Glen Canyon Dam Adaptive Management Program. The program was created to protect resources downstream of Glen Canyon Dam, including the Grand Canyon, by building on knowledge gained from experiments, operations, and management actions.

BuRec said the adaptive management program has made significant progress in understanding the relationship between Glen Canyon Dam operations and the resources of the Grand Canyon. The program's work group proposed actions over the past decade such as a high-flow release of water from the dam in 2004 to rebuild riparian and fish habitat in the Grand Canyon.

Copies of the report, and comments received during the scoping period, are available on the Internet at www.usbr.gov/uc/rm/gcdltep/index.html. BuRec expects to publish a draft EIS in April 2008 and final EIS in November 2008. A record of decision is planned for December 2008.

HydroVision International 2014 Keynote Speakers

Presenting the HydroVision International 2014 Keynote Speakers

Check out a slideshow covering the keynote speakers at the HydroVision International 2014 conference and exhibition

Click Here >>

Hydro Industry Financials

Buyers Guide Products

Project Management

Knight Piésold engineers, scientists and techni...

Environmental Services

Knight Piésold maintains the technical capabili...

QSP Environmental Packers aka Fixed End Style

SS / Viton with Pass Thru(s)

GEI's Review of an EPA Thermal Model

GEI provides water quaily and temperature analy...

Most Read Articles

Recent Comments

Buyers Guide Companies

In-Situ Inc

Designs, manufactures, and distributes environm...

Ecofish Research Ltd

Specializes in the environmental assessment and...

Cable Huston Benedict Haagensen & Lloyd LLP

Provides legal support for environmental, natur...

Gomez and Sullivan Engineers PC

We are a water resources consulting firm offeri...

Klohn Crippen Berger Ltd

An internationally-recognized engineering and e...

Continuing Education

Professional Development Hours
To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

07/01/2014
Volume 33, Issue 6
file
07/01/2014
Volume 22, Issue 4
file

Archived Articles

2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
Hydro Review Past Issues