• Connect With Us:
  • Pakistan awards study concessions for seven new hydro sites

    Pakistan's Private Power and Infrastructure Board (PPIB) has awarded letters of interest for private firms to study developing seven "raw" hydroelectric project sites totaling 1,620 MW.

    Although PPIB announced the February 8 action, it did not announce the names of the winning firms. Three of the seven projects are in Northwest Frontier Province, while four are in Pakistani-controlled Kashmir. They were offered in a notice to bidders last year. (HNN 8/10/06)

    The projects include:
    o 197-MW Kalam-Asrit, Swat River, near Kalam, Northwest Frontier Province (NWFP);
    o 209-MW Asrit-Kedam, Swat River, near Kalam, NWFP;
    o 548-MW Kaigah, Indus River, near Dasu, NWFP;
    o 222-MW Azad Pattan, Jhelum River, near Azad Pattan, Azad-Jammu-Kashmir State (AJK);
    o 240-MW Karot, Jhelum River, near Karot, AJK;
    o 65-MW Sehra, Poonch River, AJK; and
    o 139-MW Chakothi-Hatian, Jhelum River, AJK.

    PPIB said highest-ranked bidders were given letters of interest for carrying out bankable detailed feasibility studies at their own cost. On completion of the feasibility studies, the parties would be eligible to develop and build the projects.

    Federal Water and Power Minister Liaquat Ali Jatoi said the government is working on a fast-track basis to facilitate foreign and local investors to bring investment to the power sector.

    Pakistan to increase heights of 83-MW Kurram Tangi, 740-MW Munda

    A day earlier, Jatoi directed agencies to increase the heights of the 83-MW Kurram Tangi Dam and 740-MW Munda Dam.

    In a meeting of Pakistani power, water, and irrigation officials, Jatoi directed the Water and Power Development Authority to improve the design of Kurram Tangi within four months, with an increased water storage capacity of 1.2 million acre-feet. (HNN 1/16/07) He also directed Frontier Works Organization to start preliminary work for construction of the dam on the Kurram River in Northwest Frontier Province.

    The meeting also decided that Munda Dam on the Swat River is to be a multipurpose project, supplying water for irrigation, to mitigate flooding, and to generate power. The height of the dam is to be increased to 703 feet as already determined in a feasibility study.

    Hydro Industry Financials

    Buyers Guide Products

    Technical Services

    NAES develops and offers a full suite of custom...

    Digital Governor Conversions and Retrofit Kits

    Want to Go Digital? Over the last 10 years we h...

    Governor Field Service, Troubleshooting and Calibration

    Our highly-skilled Field Service Engineers know...

    Governor Replacement Parts - New and Factory Reconditioned

    We offer a complete line of brand-new, BETTER-T...

    Governor Training Classes

    From Governor School to Custom On-Site Training...

    Factory Repair Services

    We offer COMPLETE factory repair services for A...

    Most Read Articles

    Recent Comments

    Buyers Guide Companies

    Sauer Compressors USA Inc

    ABB Inc/High Current Systems

    Barr Engineering Co

    JM Power Aggregates Ltd

    Owner, inventor and distributor of an environme...

    IC-Fluid Power Inc

    Founded in 1989 to bring European fluid power t...

    Continuing Education

    Professional Development Hours
    To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

    12/01/2013
    Volume 32, Issue 10
    file
    01/01/2014
    Volume 22, Issue 1
    1401hrw-cvr

    Archived Articles

    2006 | 2007 | 2008 | 2009 | 2010 2011 | 2012 | 2013
    Hydro Review Past Issues

    Premium Content AD Promo Space